ADU fees in Mountain View: $8,997–$51,548 for a 1,000 sq ft backyard unit

Mountain View publishes typical ADU building permit fees rather than a per-sq-ft formula: $7,000 to $13,000 for new construction. On top of that come a land use document fee and, above 750 sq ft, a transportation impact fee. Water and sewer capacity fees may also apply when a new connection is needed.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

Most lots in Mountain View cap a detached ADU at 1,000 sq ft; larger sizes are shown for comparison.

  1. 499 sq ft

    $7,240–$43,032

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $7,240–$47,067

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $8,997–$51,548

    Impact fees: $3,137 max

    Itemize in calculator →
  4. 1,200 sq ft

    $9,348–$53,252

    Over the local maximum for most lots

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
Land use document fee (0.24% of construction valuation)20.24% of construction valuation, shown for the City's typical $100,000–$300,000 range.Est.$240–$720Est.$240–$720Est.$240–$720Est.$240–$720
Building permit & plan check
Building permit, new construction ADU (City's typical range, incl. inspections)1The City's published typical range for a new construction ADU, not a per-project calculation. It depends on construction valuation ($100,000–$300,000 typical).Est.$7,000–$13,000Est.$7,000–$13,000Est.$7,000–$13,000Est.$7,000–$13,000
Excavation permit, if utility or right-of-way work is needed1Up to $12,000, only when utility or right-of-way work is needed. High total only.May apply$12,000May apply$12,000May apply$12,000May apply$12,000
Impact fees
Citywide transportation fee2Per net new unit. The schedule doesn't say which rate applies to an ADU, so we show the multi-family to single-family range, prorated by ADU size over the primary home's size.ExemptExemptEst.$1,757–$3,137Est.$2,108–$3,764
School district fee
School impact fees (Mountain View Whisman / Los Altos & MVLA high school districts)3The City says new residential space over 500 sq ft pays school fees, collected by the districts. We show the statewide Level 1 maximum as an upper bound.ExemptUp to$4,035Up to$5,380Up to$6,456
Utility connections
Water capacity fee (if a new connection is required)2State law limits ADU capacity charges to a proportional share (Gov. Code 66311.5(e)) and bars new ones for most conversions. Which class the City uses for an ADU isn't stated. High total only.May apply$9,389May apply$9,389May apply$9,389May apply$9,389
Sewer capacity fee (if a new connection is required)2Same caveat as water. High total only.May apply$7,923May apply$7,923May apply$7,923May apply$7,923
Modeled total$7,240–$43,032$7,240–$47,067$8,997–$51,548$9,348–$53,252

Junior ADUs

The City's typical building permit fees for a JADU are $4,000 to $6,000 (construction valuation $25,000–$35,000). 1

Water & sewer

Conversions that fix a nonconforming condition, code violation or unpermitted structure pay no impact or connection/capacity fees unless new utility infrastructure is needed. 1

Rules

What you can build in Mountain View

Maximum size
Single-family lots: 850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms); an attached ADU is capped at 50% of the main home. Multifamily lots: 1,200 sq ft detached. 1
Height
28 ft for a 1- or 2-story ADU (a basement counts as a story). 1
Setbacks
4 ft side and rear; front per the zoning district. 1
Parking
None for a studio; one space for 1+ bedrooms, with exceptions (City Code 36.12.95). None on multifamily lots. 1
Owner occupancy
Not required for an ADU. For a JADU, an owner must live in the house or the JADU. 1
Pre-approved plans
State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). Local rule not captured yet. 4
Junior ADU (JADU)
Up to 500 sq ft, entirely within the walls of the house; a deed restriction is recorded. 1

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees start at 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Mountain View issued 86 ADU building permits in 2025

356 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 62018
  2. 152019
  3. 182020
  4. 312021
  5. 422022
  6. 1012023
  7. 572024
  8. 862025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Building permit: the City publishes only a typical range ($7,000–$13,000 for new construction), not a formula.
  • Which transportation-fee and capacity-fee class applies to an ADU.
  • Park land dedication in-lieu fee (land-value based; ADU treatment not stated).
  • School district rate.

News

Recent changes affecting Mountain View

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Mountain View

How much are ADU fees in Mountain View?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Mountain View’s official fee schedules comes to $7,240–$47,067 at 750 sq ft and $8,997–$51,548 at 1,000 sq ft. Ranges show fees that may or may not apply to your project.

Does Mountain View charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home. At 1,000 sq ft, the impact fees we model for Mountain View come to at most $3,137.

Do school fees apply to an ADU?

Only at 500 sq ft or more. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

How big can an ADU be in Mountain View?

Single-family lots: 850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms); an attached ADU is capped at 50% of the main home. Multifamily lots: 1,200 sq ft detached.

Sources

Official sources

  1. City of Mountain View, Development PermitsAccessory Dwelling Units (permit guide) (opens in new tab)Last checked Oct 18, 2026
    15 quoted lines
    • building permit fees of $7,000 to $13,000, which is based on a construction valuation (cost of labor and materials) range of $100,000 to $300,000, and
    • range of $100,000 to $300,000
    • if applicable, an excavation permit fee of up to $12,000, depending on the amount of utility improvements and construction in the public right-of-way.
    • Studio or 1 bedroom 850 square feet
    • 2 bedrooms or more 1,000 square feet
    • Gross Floor Area (Maximum) 1,200 square feet for a detached ADU.
    • For 1-story or 2-story structure: 28 feet maximum. A basement counts as a story.
    • Side 4 feet
    • Rear 4 feet
    • 1 or more bedrooms One space (covered or uncovered), which can be provided in a garage, carport, or driveway.
    • Either the single-family home or the JADU must be occupied by at least one legal owner of the property
    • Gross Floor Area (Maximum) 500 square feet
    • Must be contained entirely within the walls of a single-family home.
    • no impact fees or connection/capacity fees will be charged unless new utility infrastructure is required
    • building permit fees of $4,000 to $6,000, which is based on a construction valuation of $25,000 to $35,000, and
  2. City of Mountain ViewDevelopment Fees (effective August 22, 2026) (opens in new tab)In effect: August 22, 2026 · Last checked Oct 18, 2026
    7 quoted lines
    • Land Use Document Fee (collected on all projects at building permit) 0.24% of construction valuation
    • Multi-Family Residential Units $3,513.78 per net new unit
    • Single-Family Units (attached or detached) $6,273.15 per net new unit
    • Multi-Family and Mobile Home Units (Class 3) $5,633.02 per unit
    • Single-Family Detached Units (Class 1) $9,389.06 per unit
    • Multi-Family and Mobile Home Units (Class 3) $5,545.98 per unit
    • Single-Family Detached Units (Class 1) $7,922.69 per unit
  3. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  4. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  5. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.