Compare · checked Oct 18, 2026
Palo Alto vs Mountain View ADU fees: Palo Alto is about $15,555 lower for a 1,000 sq ft ADU
Modeled from each place’s official fee schedules for a detached ADU next to a 2,000 sq ft main home (example assumption), law in force today. Ranges count fees that always apply (low) and fees that may apply (high). Both places are fully modeled, so the totals compare like for like.
Modeled fee totals by ADU size
| Palo Alto | Mountain View | Lower | |
|---|---|---|---|
| 499 sq ft | $2,000–$8,000 | $7,240–$43,032 | Palo Alto by $35,032 |
| 750 sq ft | $2,000–$12,035 | $7,240–$47,067 | Palo Alto by $35,032 |
| 1,000 sq ft | $24,613–$35,993 | $8,997–$51,548 | Palo Alto by $15,555 |
| 1,200 sq ft | $29,136–$41,592 | $9,348–$53,252 | Palo Alto by $11,660 |
Where the money goes at 1,000 sq ft
| Palo Alto | Mountain View | |
|---|---|---|
| Planning & zoning | – | $240–$720 |
| Building permit & plan check | $2,000–$8,000 | $7,000–$25,000 |
| Impact fees | $22,613 | $1,757–$3,137 |
| School district fee | $0–$5,380 | $0–$5,380 |
| Utility connections | – | $0–$17,312 |
| Impact fees under SB 1117 (from 2027) | $5,653 | $784 |
| ADU permits issued, 2025 | 136 | 86 |
Line-by-line figures with the quoted source text: Palo Alto · Mountain View. Permits: HCD Annual Progress Report data.
Rules side by side
| Palo Alto | Mountain View | |
|---|---|---|
| Maximum size | 800 sq ft detached on any eligible lot. Larger: 900 sq ft (1 bedroom) or 1,000 sq ft (2+ bedrooms) under added City standards. | Single-family lots: 850 sq ft (studio or 1 bedroom) or 1,000 sq ft (2+ bedrooms); an attached ADU is capped at 50% of the main home. Multifamily lots: 1,200 sq ft detached. |
| Height | 16 ft (18 ft within ½ mile of transit, +2 ft to match the roof pitch). Larger ADUs under City standards: up to 25 ft or the zone limit, 2 stories. | 28 ft for a 1- or 2-story ADU (a basement counts as a story). |
| Setbacks | 4 ft rear and side; front per the zoning district. | 4 ft side and rear; front per the zoning district. |
| Parking | None for new second units (replacement uncovered parking when built with a new home that has no covered parking). | None for a studio; one space for 1+ bedrooms, with exceptions (City Code 36.12.95). None on multifamily lots. |
| Owner occupancy | Not required for an ADU. For a JADU, the owner must live in the main home or the JADU. | Not required for an ADU. For a JADU, an owner must live in the house or the JADU. |
| Pre-approved plans | State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). | State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). |
| Junior ADU (JADU) | Not captured yet. | Up to 500 sq ft, entirely within the walls of the house; a deed restriction is recorded. |
Grey text is the state floor where we haven’t captured the local rule yet.
FAQ
Palo Alto vs Mountain View: questions
Are ADU fees higher in Palo Alto or Mountain View?
For a detached 1,000 sq ft ADU with a 2,000 sq ft main home, our model of the official schedules gives Palo Alto $24,613–$35,993 and Mountain View $8,997–$51,548.
Which charges more impact fees on an ADU, Palo Alto or Mountain View?
At 1,000 sq ft: Palo Alto $22,613, Mountain View $3,137 (proportional to a 2,000 sq ft house). Neither can charge impact fees at 750 sq ft or less. From 2027, SB 1117 limits them to the area over 750 sq ft: $5,653 and $784 in our model.
What does a 750 sq ft ADU cost in fees in each?
Palo Alto: $2,000–$12,035. Mountain View: $7,240–$47,067. At 750 sq ft or less, state law bars impact fees in both.
By project type
Specific projects
More comparisons
Other matchups
- San José vs Santa Cruz County ADU fees
- Los Angeles vs San Diego ADU fees
- San Francisco vs Oakland ADU fees
- Oakland vs Berkeley ADU fees
- San José vs Santa Clara ADU fees
- Sacramento vs San José ADU fees
- Salinas vs Monterey ADU fees
- Monterey vs Monterey County ADU fees
- Santa Cruz vs Santa Cruz County ADU fees
- Long Beach vs Los Angeles ADU fees
- San Mateo vs Redwood City ADU fees