ADU fees in Sunnyvale: $2,353–$8,701 in modeled fees for 1,000 sq ft, plus valuation-based permits

Sunnyvale's building permit comes from a valuation table, with plan check and fire review each at 70% of it and a 0.54% construction tax, so the biggest costs depend on your project's valuation. Trade permits are $0.15 per sq ft each. Above 750 sq ft, the transportation impact fee applies. New ADUs over 800 sq ft on single-family lots also need a planning permit.

Totals leave out valuation-based building fees. Enter a construction valuation in the calculator to include them.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $432

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $432–$4,468

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $2,353–$8,701

    Impact fees: $2,548 max

    Itemize in calculator →
  4. 1,200 sq ft

    $2,759–$10,377

    Impact fees: $3,057 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
Miscellaneous Plan Permit (new ADU over 800 sq ft, incl. 5% surcharge)3n/an/a$281$281
Building permit & plan check
Permit issuance1$42$42$42$42
Building permit (valuation table)1Valuation is set by the Building Division from its adopted valuation tables, which aren't in the fee schedule; enter your valuation in the calculator.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Technology surcharge (5% of permit fee)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Plan check (70% of building permit fee)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Energy plan check (10% of building permit fee)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Fire prevention permit (70% of building permit fee)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Mechanical permit ($0.15 per sq ft, minimum $130)1$130$130$150$180
Electrical permit ($0.15 per sq ft, minimum $130)1$130$130$150$180
Plumbing permit ($0.15 per sq ft, minimum $130)1$130$130$150$180
General plan maintenance (0.15% of valuation)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Construction taxes
Construction tax (0.54% of valuation)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Impact fees
Transportation impact fee (south of Route 237)2The schedule lists $5,095 per single-family home and $3,158 per multifamily unit but no ADU rate. We show that range, prorated by ADU ÷ main-home size as state law requires. North of Route 237 and plan areas have other rates.ExemptExemptEst.$1,579–$2,548Est.$1,895–$3,057
School district fee
School fees (your elementary and high school districts)5District rates not captured yet; shown at the 2026 statewide Level 1 maximum as an upper bound.ExemptUp to$4,035Up to$5,380Up to$6,456
Modeled total$432$432–$4,468$2,353–$8,701$2,759–$10,377

Rules

What you can build in Sunnyvale

Maximum size
State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft. Local rule not captured yet. 6
Height
State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. Local rule not captured yet. 6
Setbacks
State limit: no more than 4 ft side and rear. Local rule not captured yet. 6
Parking
State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. Local rule not captured yet. 6
Owner occupancy
State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). Local rule not captured yet. 6
Pre-approved plans
The City runs a Pre-approved ADU Plans Gallery with a streamlined permit process. 4
Approval process
New ADUs up to 800 sq ft on single-family lots, conversions and JADUs need only a building permit. Larger new ADUs on single-family lots need a Miscellaneous Plan Permit first. 4

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees start at 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Sunnyvale issued 107 ADU building permits in 2025

515 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 302018
  2. 492019
  3. 592020
  4. 792021
  5. 592022
  6. 592023
  7. 732024
  8. 1072025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • The building permit and the fees based on it (plan check, fire, energy, technology) plus the construction tax and general plan fee depend on valuation from the City's own tables, so modeled totals leave them out. Enter a valuation in the calculator.
  • Park in-lieu fees are listed for residential projects by density; whether the City charges them on ADUs isn't stated on the fee sheet, so they aren't included.
  • Size, height, setback and parking standards aren't captured yet (the City's code is Chapter 19.79); state minimums are shown.
  • Sewer and water connection charges aren't included. School district rates not captured; shown at the statewide cap.

News

Recent changes affecting Sunnyvale

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

State lawStatewide

SB 543 takes effect: no impact fees at 750 sq ft or less, now in Gov. Code 66311.5

SB 543 (Chapter 520, Statutes of 2025) took effect January 1, 2026. It restates the impact-fee rule in Gov. Code 66311.5: no impact fees on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less; above that, fees must be proportional to the primary home. It also caps JADUs at 500 sq ft of interior livable space. Many city documents still cite the older section numbers (65852.2 or 66324).

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Sunnyvale

How much are ADU fees in Sunnyvale?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Sunnyvale’s official fee schedules comes to $432–$4,468 at 750 sq ft and $2,353–$8,701 at 1,000 sq ft. These totals leave out valuation-based building fees. Ranges show fees that may or may not apply to your project.

Does Sunnyvale charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home. At 1,000 sq ft, the impact fees we model for Sunnyvale come to at most $2,548.

Do school fees apply to an ADU?

Only at 500 sq ft or more. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

Sources

Official sources

  1. City of Sunnyvale, Building DivisionBuilding Permit Fees, Fiscal Year 26/27 (effective August 18, 2026) (opens in new tab)In effect: August 18, 2026 · Last checked Oct 18, 2026
    16 quoted lines
    • Permit Issuance $42.50
    • $50,001 to $100,000 $1,620.00 for the first $50,000 plus $17.00 for each additional $1,000 or
    • $100,001 to $500,000 $2,445.00 for the first $100,000 plus $13.50 for each additional $1,000 or
    • $500,001 to $1,000,000 $7,711.00 for the first $500,000 plus $11.50 for each additional $1,000 or
    • $1,000,001 and up $13,303.00 for the first $1,000,000 plus $7.50 for each additional $1,000 or
    • Technology Surcharge 5% of permit fee
    • Plan Check 70% of the Building Permit Fee
    • Energy Plan Check 10% of the Building Permit Fee
    • Fire Prevention Permit 70% of the Building Permit Fee
    • Mechanical Permit Residential (per square foot) $ 0.15
    • Residential Minimum Fee $ 130.00
    • Electrical Permit Residential (per square foot) $ 0.15
    • Plumbing Permit Residential (per square foot) $ 0.15
    • Construction Tax 0.54% of the Total Valuation
    • (Charged for all projects other than residential remodels)
    • General Plan Maintenance 0.15% of the Total Valuation
  2. City of SunnyvaleDevelopment Impact Fees, FY 2026-2027 (effective August 18, 2026) (opens in new tab)In effect: August 18, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Single-Family, detached* $5,095/unit
    • Multi-family, attached* $3,158/unit
  3. City of Sunnyvale, Planning DivisionFY 2026/27 Planning Division Fees (opens in new tab)In effect: FY 2026/27 · Last checked Oct 18, 2026
    1 quoted line
    • Miscellaneous Plan Permit Residential <3 units & ADU/DUO *0179 $ 268.00 5% $ 281.40
  4. City of Sunnyvale, Permit CenterAccessory Dwelling Units (opens in new tab)Last checked Oct 18, 2026
    4 quoted lines
    • New Construction ADUs up to 800 square feet on SFH lots
    • ADUs that qualify for streamlined review only require a Building Permit. The following ADUs qualify for streamlined review:
    • If you plan to build a new ADU larger than 800 square feet on a single-family lot, you must first apply for a Miscellaneous Plan Permit (MPP).
    • ADU Pre-approved Plans Gallery – View pre-approved ADU plans that have a streamlined permitting process.
  5. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  6. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  7. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.