San Mateo vs Redwood City ADU fees: San Mateo $8,702–$20,090 vs Redwood City $5,170 in modeled fees for 1,000 sq ft, before building permits in both
Modeled from each place’s official fee schedules for a detached ADU next to a 2,000 sq ft main home (example assumption), law in force today. Ranges count fees that always apply (low) and fees that may apply (high). Not like for like: San Mateo: Totals leave out valuation-based building fees. Redwood City: Totals leave out new adu base building fee at some sizes.
Modeled fee totals by ADU size
| San Mateo | Redwood City | Lower | |
|---|---|---|---|
| 499 sq ft | $5,761 | $4,661 | Redwood City by $1,100 |
| 750 sq ft | $7,234–$11,269 | $9,199 | Redwood City by $2,070 |
| 1,000 sq ft | $8,702–$20,090 | $5,170 | Redwood City by $14,920 |
| 1,200 sq ft | $9,876–$23,542 | $6,204 | Redwood City by $17,338 |
Where the money goes at 1,000 sq ft
| San Mateo | Redwood City | |
|---|---|---|
| Building permit & plan check | Needs valuation | Needs valuation |
| Impact fees | $0–$6,008 | $0 |
| School district fee | $0–$5,380 | $5,170 |
| Utility connections | $5,870 | – |
| Impact fees under SB 1117 (from 2027) | $1,502 | $0 |
| ADU permits issued, 2025 | 151 | 63 |
Line-by-line figures with the quoted source text: San Mateo · Redwood City. Permits: HCD Annual Progress Report data.
Rules side by side
| San Mateo | Redwood City | |
|---|---|---|
| Maximum size | State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft. | Up to 850 sq ft for a one-bedroom ADU, or 1,000 sq ft with more than one bedroom. |
| Height | State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. | State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. |
| Setbacks | State limit: no more than 4 ft side and rear. | State limit: no more than 4 ft side and rear. |
| Parking | State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. | State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. |
| Owner occupancy | State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). | State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). |
| Pre-approved plans | State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). | State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). |
Grey text is the state floor where we haven’t captured the local rule yet.
FAQ
San Mateo vs Redwood City: questions
Are ADU fees higher in San Mateo or Redwood City?
For a detached 1,000 sq ft ADU with a 2,000 sq ft main home, our model of the official schedules gives San Mateo $8,702–$20,090 and Redwood City $5,170. San Mateo: Totals leave out valuation-based building fees. Redwood City: Totals leave out new adu base building fee at some sizes.
Which charges more impact fees on an ADU, San Mateo or Redwood City?
At 1,000 sq ft: San Mateo $6,008, Redwood City $0 (proportional to a 2,000 sq ft house). Neither can charge impact fees at 750 sq ft or less. From 2027, SB 1117 limits them to the area over 750 sq ft: $1,502 and $0 in our model.
What does a 750 sq ft ADU cost in fees in each?
San Mateo: $7,234–$11,269. Redwood City: $9,199. At 750 sq ft or less, state law bars impact fees in both.
By project type
Specific projects
More comparisons
Other matchups
- San José vs Santa Cruz County ADU fees
- Los Angeles vs San Diego ADU fees
- San Francisco vs Oakland ADU fees
- Oakland vs Berkeley ADU fees
- San José vs Santa Clara ADU fees
- Palo Alto vs Mountain View ADU fees
- Sacramento vs San José ADU fees
- Salinas vs Monterey ADU fees
- Monterey vs Monterey County ADU fees
- Santa Cruz vs Santa Cruz County ADU fees
- Long Beach vs Los Angeles ADU fees