ADU FeeMap

Compare · checked Oct 18, 2026

Los Angeles vs San Diego ADU fees: Los Angeles $250–$5,630 vs San Diego $16,137–$21,682 in modeled fees for 1,000 sq ft, before building permits in Los Angeles

Modeled from each place’s official fee schedules for a detached ADU next to a 2,000 sq ft main home (example assumption), law in force today. Ranges count fees that always apply (low) and fees that may apply (high). Not like for like: Los Angeles: Totals leave out LADBS building permit and plan check fees. San Diego: Totals leave out water and sewer capacity fees.

Modeled fee totals by ADU size

Los AngelesSan DiegoLower
499 sq ft$0$6,117–$6,282Los Angeles by $6,282
750 sq ft$0–$4,035$16,137–$20,337Los Angeles by $16,302
1,000 sq ft$250–$5,630$16,137–$21,682Los Angeles by $16,052
1,200 sq ft$300–$6,756$16,137–$22,758Los Angeles by $16,002

Where the money goes at 1,000 sq ft

Los AngelesSan Diego
Planning & zoning–$737
Building permit & plan check–$15,400–$15,565
Impact fees$250$0
School district fee$0–$5,380$0–$5,380
Impact fees under SB 1117 (from 2027)$62$0
ADU permits issued, 2025123292165

Line-by-line figures with the quoted source text: Los Angeles · San Diego. Permits: HCD Annual Progress Report data.

Rules side by side

Los AngelesSan Diego
Maximum sizeState floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft.State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft.
HeightState floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached.State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached.
SetbacksState limit: no more than 4 ft side and rear.State limit: no more than 4 ft side and rear.
ParkingState limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases.State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases.
Owner occupancyState law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared).State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared).
Pre-approved plansState law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27).State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27).

Grey text is the state floor where we haven’t captured the local rule yet.

Itemize Los Angeles Itemize San Diego All places

FAQ

Los Angeles vs San Diego: questions

Are ADU fees higher in Los Angeles or San Diego?

For a detached 1,000 sq ft ADU with a 2,000 sq ft main home, our model of the official schedules gives Los Angeles $250–$5,630 and San Diego $16,137–$21,682. Los Angeles: Totals leave out LADBS building permit and plan check fees. San Diego: Totals leave out water and sewer capacity fees.

Which charges more impact fees on an ADU, Los Angeles or San Diego?

At 1,000 sq ft: Los Angeles $250, San Diego $0 (proportional to a 2,000 sq ft house). Neither can charge impact fees at 750 sq ft or less. From 2027, SB 1117 limits them to the area over 750 sq ft: $62 and $0 in our model.

What does a 750 sq ft ADU cost in fees in each?

Los Angeles: $0–$4,035. San Diego: $16,137–$20,337. At 750 sq ft or less, state law bars impact fees in both.