Updated Oct 18, 2026

ADU fees in Scotts Valley: $17,183–$23,110 in modeled fees for 1,000 sq ft, plus valuation-based permits

Scotts Valley charges development impact fees per unit. ADUs of 750 sq ft or less pay none; above that, the per-unit amounts are prorated, and parks have a separate "second unit" rate. Building permit fees come from a valuation scale, but the City doesn't publish the per-sq-ft valuation it uses, so we can't model them.

Totals leave out valuation-based building fees and permit technology fee at some sizes. Enter a construction valuation in the calculator to include them.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $0–$360

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $0–$4,395

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $17,183–$23,110

    Impact fees: $17,370 max

    Itemize in calculator →
  4. 1,200 sq ft

    $19,160–$26,200

    Impact fees: $19,384 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
General Plan maintenance (0.55% of valuation)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Design review, single-family/ADU (up to 1 hour)1The ADU manual says a compliant ADU needs only a building permit, so this may not apply. High total only.May apply$360May apply$360May apply$360May apply$360
Building permit & plan check
Building plan check and processing (valuation scale, includes MEP)1Scale on the building valuation, which the City sets and doesn't publish per sq ft. Enter your own valuation in the calculator to compute it. Example: from $100,001, $3,158 + $7 per extra $1,000.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Green Building Education Fund (0.25% of valuation)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Permit technology fee (4% of permit fees)1Needs valuationNeeds valuationNeeds valuationNeeds valuation
Impact fees
General facilities & equipment2ExemptExemptEst.$288Est.$346
Streets & thoroughfares2ExemptExemptEst.$3,801Est.$4,561
Wastewater treatment facilities2ExemptExemptEst.$4,032Est.$4,839
Library facilities2ExemptExemptEst.$565Est.$678
Law enforcement facilities2ExemptExemptEst.$667Est.$800
Park & recreation facilities (second-unit rate)2The City's own rate for a second unit; we don't prorate it further.ExemptExempt$7,018$7,018
Storm drainage (per sq ft of new impervious area)2$0.15–$0.33 per sq ft of impervious surface, depending on the watershed. We assume new impervious area equals the ADU's floor area (one story).ExemptExemptEst.$150–$330Est.$180–$396
Impact fee administrative charge (4%)2$0$0$661–$668$737–$746
School district fee
School fees (Scotts Valley Unified)4District rate not checked; statewide Level 1 maximum shown as an upper bound.ExemptUp to$4,035Up to$5,380Up to$6,456
Modeled total$0–$360$0–$4,395$17,183–$23,110$19,160–$26,200

Water & sewer

Scotts Valley Water District serves most of the city. New ADUs within 200 ft of a sewer connection point must connect to municipal sewer. The City lists a sewer lateral connection inspection fee; water district charges are not modeled. 3

Rules

What you can build in Scotts Valley

Maximum size
850 to 1,200 sq ft, depending on zoning and whether the ADU meets the primary-dwelling setbacks. 3
Height
Up to 35 ft for a detached ADU in R-1, R-R or R-MT that meets single-family setbacks; otherwise the state limits apply. 3
Setbacks
4 ft from side and rear lines; the primary dwelling's front setback applies. None for conversions or replacements. 3
Parking
Usually one space; none for JADUs and in several other cases. 3
Owner occupancy
Never for an ADU. For a JADU, only if it shares a bathroom with the main home. 3
Pre-approved plans
Pre-Reviewed ADU Program: vendor plans accepted by the City, still with a site-specific application. 3

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees start at 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Scotts Valley issued 9 ADU building permits in 2025

38 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 12018
  2. 22019
  3. –2020
  4. 62021
  5. 112022
  6. 32023
  7. 62024
  8. 92025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Building permit, General Plan maintenance and green building fees depend on a building valuation the City sets (no per-sq-ft rate published). They're left out of the modeled totals; the calculator computes them if you enter a valuation.
  • Per-unit impact fees use the Single Family (R-1-10) column; other zones differ (shown on the City's sheet).
  • Water district connection charges.
  • School district's actual rate.

News

Recent changes affecting Scotts Valley

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

Impact feesScotts Valley

Scotts Valley's 2026-27 impact fee schedule: no DIF on ADUs of 750 sq ft or less

Scotts Valley's development impact fee schedule, effective July 7, 2026, restates that ADUs of 750 sq ft or less pay no development impact fees. It lists per-unit fees by zone and a separate "Second Unit" park fee of $7,018. A 4% administrative charge applies to impact fees.

Source: City of Scotts Valley: Schedule of Development Impact Fees 2026-2027 (effective July 7, 2026) (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Scotts Valley

How much are ADU fees in Scotts Valley?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Scotts Valley’s official fee schedules comes to $0–$4,395 at 750 sq ft and $17,183–$23,110 at 1,000 sq ft. These totals leave out valuation-based building fees and permit technology fee at some sizes. Ranges show fees that may or may not apply to your project.

Does Scotts Valley charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home. At 1,000 sq ft, the impact fees we model for Scotts Valley come to at most $17,370.

Do school fees apply to an ADU?

Only at 500 sq ft or more. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

How big can an ADU be in Scotts Valley?

850 to 1,200 sq ft, depending on zoning and whether the ADU meets the primary-dwelling setbacks.

Sources

Official sources

  1. City of Scotts ValleyMaster Fee Schedule, Fiscal Year 2026-27 (opens in new tab)In effect: July 6, 2026 · Last checked Oct 18, 2026
    18 quoted lines
    • Building Plan Check and Processing (deposit) - New
    • Construction, Addition, Remodels, unless otherwise
    • specified. Includes associated Mechanical, Plumbing,
    • 25,001 $ 1,291
    • 100,001 $ 3,158
    • 500,001 $ 6,460
    • 5,001 $ 861
    • each additional $1,000 or fraction thereof each add'l $1000 $ 7
    • each additional $1,000 or fraction thereof each add'l $1000 $ 23
    • each additional $1,000 or fraction thereof each add'l $1000 $ 20
    • each additional $1,000 or fraction thereof each add'l $1000 $ 30
    • General Plan Maintenance per permit [3] valuation (all building
    • .0055 per $1 building
    • .0025 per $1 building
    • Green Building Education Fund per permit [3] valuation (all building
    • 4% of total value of
    • Permit Technology Fee per permit [5]
    • Single-Family Residential/ADU - Up to 1 hr flat / hourly [7] $ 360
  2. City of Scotts ValleySchedule of Development Impact Fees 2026-2027 (effective July 7, 2026) (opens in new tab)In effect: July 7, 2026 · Last checked Oct 18, 2026
    11 quoted lines
    • Single Family (R-1-10) $577.00
    • ADUs 750SF and under are not required to pay DIF per state code (Gov. Code 65852.2)
    • Single Family (R-1-10) $7,602.00
    • Single Family (R-1-10) $8,065.00
    • Single Family (R-1-10) $1,130.00
    • Single Family (R-1-10) $1,334.00
    • Mobile Homes and Second Unit $7,018.00
    • Residential or Commercial per Impervious SF Amount
    • Camp Evers Tributary $0.15
    • Cabonera Creek $0.33
    • An administrative fee of 4% will be applied to all development impact fees
  3. City of Scotts ValleyADU Manual / Pre-Reviewed ADU Program guide (opens in new tab)Last checked Oct 18, 2026
    8 quoted lines
    • The maximum size of an ADU ranges from 850 square feet to 1,200 square feet depending on your
    • Potentially, if your property is zoned R-1, R-R, or R-MT. In these zones, a height of up to 35 feet is
    • Most ADUs must be setback a minimum of 4 feet from side and rear property lines and must
    • In most cases, one parking space is required for an ADU. Parking is not required for JADUs and in
    • Properties with an ADU are never required to be owner occupied. For JADUs, an
    • While these plans have been accepted into the City’s Pre-
    • you must connect to municipal sewer services if
    • your property is 200 feet or less from the point at which a connection can be made to the municipal
  4. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  5. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  6. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026