ADU FeeMap

Updated Oct 18, 2026

ADU fees in Santa Cruz: $12,785–$21,165 for a 1,000 sq ft backyard unit

The City of Santa Cruz prices ADU building permits from valuation ($220 per sq ft for wood-frame homes). It adds trade-permit percentages, a 6% technology surcharge and a reduced General Plan fee for ADUs. Above 750 sq ft, public-safety and child-care impact fees apply.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $6,095–$7,592

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $7,463–$13,748

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $12,785–$21,165

    Impact fees: $3,958 max

    Itemize in calculator →
  4. 1,200 sq ft

    $14,590–$24,646

    Impact fees: $4,672 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
Planning plan check ($401 + $4 per $1,000 valuation)1Est.$840Est.$1,061Est.$1,281Est.$1,457
General Plan maintenance fee for ADUs (0.61% of valuation)1Est.$670Est.$1,006Est.$1,342Est.$1,610
Building permit & plan check
Building permit (valuation table)1Valuation = ADU sq ft × $220.00, the City's R-3 rate for wood-frame (type V) construction. From $100,000 valuation: $2,132 + $3 per extra $1,000 (or fraction).Est.$2,162Est.$2,327Est.$2,492Est.$2,624
Electrical permit (17% of building permit)1$368$396$424$446
Mechanical permit (7% of building permit)1$151$163$174$184
Plumbing permit (16% of building permit + $64 issuance)1Plus a $64 plumbing permit issuance fee, shown on its own line.$346$372$399$420
Plumbing permit issuance1$64$64$64$64
Energy (Title 24) review1The minimum charge; billed hourly beyond that.$152$152$152$152
Green Building Program (1% of valuation)1Est.$1,098Est.$1,650Est.$2,200Est.$2,640
Technology surcharge (6%)16% on building and planning fees. Not charged on impact fees, the General Plan fee or the Green Building fee (which is exempt from CPI and listed separately).$245$272$299$321
Construction taxes
Parks & recreation facilities tax ($3 per sq ft)1An excise tax on new residential dwelling units (SCMC 5.72), not an impact fee, so the 750 sq ft exemption doesn't cover it. The schedule doesn't say how it applies to ADUs, so it counts toward the high total only.May apply$1,497May apply$2,250May apply$3,000May apply$3,600
Impact fees
Public safety impact fee: police1ExemptExempt$1,690$2,028
Public safety impact fee: fire1ExemptExempt$1,880$2,256
Childcare impact fee1$0.633 per sq ft, capped at $388 per bedroom. Any ADU above 750 sq ft is past the 614 sq ft cap, so we use $388 for one bedroom.ExemptExemptEst.$388Est.$388
School district fee
School impact fee (Santa Cruz City Schools)3The City's ADU page puts the school fee at "around $3.15/square foot" and describes ADUs under 750 sq ft as below the threshold. State law exempts ADUs under 500 sq ft. We show the statewide Level 1 maximum as an upper bound.ExemptUp to$4,035Up to$5,380Up to$6,456
Modeled total$6,095–$7,592$7,463–$13,748$12,785–$21,165$14,590–$24,646

Water & sewer

The City says new detached ADUs "will almost always trigger the requirement for new water and sewer connections and the associated fees". Conversions and attached ADUs usually don't need separate connections but may need a bigger meter. We have not modeled Santa Cruz Water Department or sewer connection charges. 2

Rules

What you can build in Santa Cruz

Maximum size
Non-exempt detached ADU: 10% of net lot area up to 1,200 sq ft, or 850 sq ft (studio or 1 bedroom) / 1,000 sq ft (2+ bedrooms). A Statewide Exemption detached ADU: up to 800 sq ft. 2
Height
Non-exempt detached ADU: up to 22 ft to the roof peak. Statewide Exemption ADU: 16 ft (18 ft near transit). 2
Setbacks
Non-exempt detached ADU: 3 ft from interior side and rear lines; 4 ft for any part over 16 ft tall. Statewide Exemption ADU: 4 ft. 2
Parking
None outside the Coastal Zone. Inside it, one space near the coast (City GIS layer "ADU Parking Required"). 2
Owner occupancy
Not required for an ADU. Required for a JADU. 2
Pre-approved plans
State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). Local rule not captured yet. 4
Junior ADU (JADU)
Up to 500 sq ft; the owner must live in the JADU or the main home and record a land use agreement. 2

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees start at 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Santa Cruz issued 79 ADU building permits in 2025

626 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 542018
  2. 592019
  3. 672020
  4. 802021
  5. 992022
  6. 822023
  7. 1062024
  8. 792025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Water and sewer connection fees (the City says new detached ADUs almost always pay them).
  • Traffic impact fee, which applies only in Council-designated areas.
  • Whether the Parks & Recreation facilities tax applies to ADUs (high total only).
  • Addressing fee (hourly) and Coastal Permit fees where they apply.
  • School district's actual rate (statewide Level 1 maximum shown).

News

Recent changes affecting Santa Cruz

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

State lawStatewide

SB 543 takes effect: no impact fees at 750 sq ft or less, now in Gov. Code 66311.5

SB 543 (Chapter 520, Statutes of 2025) took effect January 1, 2026. It restates the impact-fee rule in Gov. Code 66311.5: no impact fees on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less; above that, fees must be proportional to the primary home. It also caps JADUs at 500 sq ft of interior livable space. Many city documents still cite the older section numbers (65852.2 or 66324).

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Santa Cruz

How much are ADU fees in Santa Cruz?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Santa Cruz’s official fee schedules comes to $7,463–$13,748 at 750 sq ft and $12,785–$21,165 at 1,000 sq ft. Ranges show fees that may or may not apply to your project.

Does Santa Cruz charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home. At 1,000 sq ft, the impact fees we model for Santa Cruz come to at most $3,958.

Do school fees apply to an ADU?

Only at 500 sq ft or more. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

How big can an ADU be in Santa Cruz?

Non-exempt detached ADU: 10% of net lot area up to 1,200 sq ft, or 850 sq ft (studio or 1 bedroom) / 1,000 sq ft (2+ bedrooms). A Statewide Exemption detached ADU: up to 800 sq ft.

Sources

Official sources

  1. City of Santa Cruz, Planning and Community DevelopmentDepartment Fee Schedule (effective January 1, 2026, updated 1/5/2026) (opens in new tab)In effect: January 1, 2026 · Last checked Oct 18, 2026
    29 quoted lines
    • R-3 Residential, one and two family 246.80 240.06 234.14 227.66 220.00 223.84 223.84 220.00 220.00
    • Valuation Base Fee: $2,132.00 for the first $100,000.00
    • plus $3.00 for each additional $1,000.00, or fraction
    • Valuation Base Fee: $1,445.00 for the first $50,000.00
    • plus $13.00 for each additional $1,000.00, or fraction
    • Electrical Single- and two-family. For new single- and
    • 17% of
    • Single- and two-family. For new single- and two-family New Fee -
    • 7% of
    • Single- and two-family. For new single- and two-family 16 % of
    • PL-BLD86 Issuance of each plumbing permit $64.00
    • PL-BLD133 Energy T-24 ( Min + Per Hour) $152.00
    • Residential Projects: New SFD'S, ADU'S, and additions are a one time fee and should be collected at intake;
    • PL-BLD3 Green Building Program Management 1% of project
    • R-3 Residential, one and two family 246.80 240.06 234.14 227.66 220.00
    • PL-CP47 Plan Check: Planning $401.00
    • PL-CP48 Plan Check: Planning plus, per $1,000 valuation charged $4.00
    • PL-CP37 General Plan Maintenance Fee: ADU 0.61% of
    • PL-BLD2 Technology Surcharge 6% PLC
    • Applied to all fees and charges, except for
    • impact fees, inclusionary housing in-lieu fees, and General Plan Maintenance Fee.
    • POL-PSIF Single-Family Residential (per ft2) $1.69
    • State law prohibits charging any impact fees
    • on ADUs less than 750 ft2.
    • FIRE-PSIF Single-Family Residential (per ft2) $1.88
    • PL-CIF1 Single-Family Residential (per ft2) $0.633 [PLA]
    • (Max: 614 ft2 at $388 per bedroom) [PLB]
    • The sum of $3.00 for each square foot of a residential dwelling unit, or portion thereof, to be
    • constructed and/or developed;
  2. City of Santa Cruz, Planning and Community DevelopmentAccessory Dwelling Units (ADUs) (opens in new tab)Last checked Oct 18, 2026
    9 quoted lines
    • 10% of the net lot area of the parcel, up to a maximum of 1200 square feet of habitable area
    • Up to 850 square feet for a studio or 1-bedroom unit, or up to 1000 square feet for units with more than one bedroom.
    • The new construction detached ADU may be up to 22' in height to the roof peak.
    • New construction detached ADUs must be setback a minimum of 3' from the interior side and rear property lines.
    • Outside the Coastal Zone, no parking is required for an ADU.
    • No owner occupancy is required on properties with ADUs.
    • The JADU can be up to 500 square feet in size.
    • The owner needs to live in either JADU or in the primary dwelling to which the JADU is attached.
    • ADUs created as detached New Construction will almost always trigger the requirement for new water and sewer connections and the associated fees.
  3. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  4. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  5. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.