ADU FeeMap

Updated Oct 18, 2026

ADU fees in Monterey County: $0–$5,380 in modeled fees for 1,000 sq ft, plus valuation-based permits

In unincorporated Monterey County, a new ADU up to 750 sq ft gets a reduced plan check fee: 32.5% of the building inspection fee instead of the usual 65%. Both are set from construction valuation, which the County takes from the ICC valuation tables. Enter your valuation to see the permit lines; area-specific traffic and park fees aren’t modeled.

Totals leave out permit fees until you enter a construction valuation, and area-specific impact fees and valuation-based building fees and plan check: new adu up to 750 sq ft, plan check: adu over 750 sq ft at some sizes. Enter a construction valuation in the calculator to include them.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $0

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $0–$4,035

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $0–$5,380

    Impact fees: $0 max

    Itemize in calculator →
  4. 1,200 sq ft

    $0–$6,456

    Impact fees: $0 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
General Plan Management Fee115% of the permit fee; we apply it to the building inspection fee.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Building permit & plan check
Building inspection (valuation table)1Single-family new construction rows: base for the valuation range plus the increment per $1,000 or fraction above it. The County values construction from the current ICC Building Valuation Data; enter your valuation.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Plan check: new ADU up to 750 sq ft (32.5%)132.5% of the building inspection fee for a new ADU up to 750 sq ft.Needs valuationNeeds valuationn/an/a
Plan check: ADU over 750 sq ft (single-family rate, 65%)1The reduced ADU rate is only for ADUs up to 750 sq ft; above that we apply the single-family plan check rate of 65%.n/an/aNeeds valuationNeeds valuation
Technology Fee113% of the permit fee; we apply it to the building inspection fee.Needs valuationNeeds valuationNeeds valuationNeeds valuation
School district fee
School fee (district; statewide cap shown)2ExemptUp to$4,035Up to$5,380Up to$6,456
Modeled total$0$0–$4,035$0–$5,380$0–$6,456

More

More on ADU fees in Monterey County

Rules

What you can build in Monterey County

Maximum size
State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft. Local rule not captured yet. 3
Height
State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. Local rule not captured yet. 3
Setbacks
State limit: no more than 4 ft side and rear. Local rule not captured yet. 3
Parking
State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. Local rule not captured yet. 3
Owner occupancy
State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). Local rule not captured yet. 3
Pre-approved plans
State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). Local rule not captured yet. 3

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees apply only above 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Monterey County issued 61 ADU building permits in 2025

283 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 92018
  2. 132019
  3. 212020
  4. 312021
  5. 452022
  6. 492023
  7. 542024
  8. 612025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Building inspection and plan check depend on valuation; the County uses the ICC Building Valuation Data, which we don’t reproduce. Enter your own valuation.
  • Area-specific traffic impact fees, the TAMC regional fee, park (Quimby) fees, Environmental Health septic/well reviews and Water Resources Agency fees aren’t modeled.
  • Planning or coastal permits, where an ADU needs one, aren’t included. The Standardized ADU Plan Review option ($646) isn’t shown.

News

Recent changes affecting Monterey County

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

State lawStatewide

SB 543 takes effect: no impact fees at 750 sq ft or less, now in Gov. Code 66311.5

SB 543 (Chapter 520, Statutes of 2025) took effect January 1, 2026. It restates the impact-fee rule in Gov. Code 66311.5: no impact fees on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less; above that, fees must be proportional to the primary home. It also caps JADUs at 500 sq ft of interior livable space. Many city documents still cite the older section numbers (65852.2 or 66324).

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Monterey County

How much are ADU fees in Monterey County?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Monterey County’s official fee schedules comes to $0–$4,035 at 750 sq ft and $0–$5,380 at 1,000 sq ft. These totals leave out permit fees until you enter a construction valuation, and area-specific impact fees and valuation-based building fees and plan check: new adu up to 750 sq ft, plan check: adu over 750 sq ft at some sizes. Ranges show fees that may or may not apply to your project.

Does Monterey County charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home.

Do school fees apply to an ADU?

Only above 500 sq ft. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

Sources

Official sources

  1. County of Monterey Housing & Community DevelopmentArticle XIX – Building Services fees (Resolution No. 26-017) (opens in new tab)In effect: Adopted February 3, 2026 · Last checked Oct 18, 2026
    11 quoted lines
    • Single Family Residential - New Construction / Remodels / Additions
    • $2,001 - $25,000 Base $329.36 Each Additional $1,000 or fraction $2,001 - $25,000 thereof $52.18
    • $25,001 - $50,000 Base $1,529.56 Each Additional $1,000 or fraction $25,001 - $50,000 thereof $68.77
    • $50,001 - $100,000 Base $3,248.89 Each Additional $1,000 or fraction $50,001 - $100,000 thereof $34.83
    • $100,001 - $500,000 Base $4,990.57 Each Additional $1,000 or fraction $100,001 - $500,000 thereof $2.18
    • $500,001 - $1,000,000 Base $5,861.41 Each Additional $1,000 or fraction $500,001 - $1,000,000 thereof $2.61
    • 4. Construction valuation is determined from the current International Code Council Building Valuation Data
    • Accessory Dwelling Unit (New) - Up to 750 sf % of Bldg Insp Fee 32.5%
    • Single Family Residential Plan Check % of Bldg Insp Fee 65%
    • General Plan Management Fee % of Permit Fee 15.00%
    • Technology Fee % of Permit Fee 13.00%
  2. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  3. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  4. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.