ADU fees in Gilroy: $9,959–$15,439 in modeled fees for 1,000 sq ft, plus valuation-based permits

Gilroy publishes ADU-specific impact fees for units of 750 sq ft or larger, each multiplied by the ADU's share of the main home's size. Its building permit fee comes from a valuation table, so that part depends on your project's valuation.

Totals leave out valuation-based building fees. Enter a construction valuation in the calculator to include them.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $0–$100

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $0–$4,135

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $9,959–$15,439

    Impact fees: $9,959 max

    Itemize in calculator →
  4. 1,200 sq ft

    $11,951–$18,507

    Impact fees: $11,951 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Building permit & plan check
Building permit (valuation table)2Base fee for the valuation band plus a set amount for every $1,000 over the band minimum (FY 2026-27 rates). Gilroy bases valuation on the higher of your estimate or ICC Building Valuation Data, so enter your valuation in the calculator.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Building plan check (75% of building permit fee)2Needs valuationNeeds valuationNeeds valuationNeeds valuation
General plan update fee (13% of building fees)213% of building and engineering fees; we apply it to the building permit and plan check fees.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Building technology fee (5% of permit fees)2Needs valuationNeeds valuationNeeds valuationNeeds valuation
State strong-motion (SMIP) fee2Needs valuationNeeds valuationNeeds valuationNeeds valuation
Addressing fee2Charged if the ADU needs its own address.May apply$100May apply$100May apply$100May apply$100
Impact fees
Public facilities impact fee1Gilroy lists $9,749.07 for an ADU of 750 sq ft or larger, multiplied by ADU sq ft ÷ primary-home sq ft (FY 2026-27).ExemptExemptEst.$4,875Est.$5,849
Traffic impact fee1Gilroy lists $5,430.25 for an ADU of 750 sq ft or larger, multiplied by ADU sq ft ÷ primary-home sq ft (FY 2026-27).ExemptExemptEst.$2,715Est.$3,258
Sewer development impact fee1Gilroy lists $3,676.38 for an ADU of 750 sq ft or larger, multiplied by ADU sq ft ÷ primary-home sq ft (FY 2026-27).ExemptExemptEst.$1,838Est.$2,206
Water development impact fee1Gilroy lists $943.77 for an ADU of 750 sq ft or larger, multiplied by ADU sq ft ÷ primary-home sq ft (FY 2026-27).ExemptExemptEst.$472Est.$566
Storm development impact fee1Gilroy lists $118.82 for an ADU of 750 sq ft or larger, multiplied by ADU sq ft ÷ primary-home sq ft (FY 2026-27).ExemptExemptEst.$59Est.$71
School district fee
School fee (Gilroy Unified; statewide cap shown)4ExemptUp to$4,035Up to$5,380Up to$6,456
Modeled total$0–$100$0–$4,135$9,959–$15,439$11,951–$18,507

Rules

What you can build in Gilroy

Maximum size
State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft. Local rule not captured yet. 5
Height
State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. Local rule not captured yet. 5
Setbacks
State limit: no more than 4 ft side and rear. Local rule not captured yet. 5
Parking
State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. Local rule not captured yet. 5
Owner occupancy
State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). Local rule not captured yet. 5
Pre-approved plans
State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). Local rule not captured yet. 5

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees start at 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Gilroy issued 29 ADU building permits in 2025

198 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 72018
  2. 162019
  3. 132020
  4. 272021
  5. 162022
  6. 502023
  7. 402024
  8. 292025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Building permit fees use a valuation table; Gilroy doesn't publish a fixed valuation per sq ft for ADUs, so modeled totals leave them out. Enter a valuation in the calculator.
  • Trade permits (electrical, mechanical, plumbing), the state BSASRF fee, fire plan check, street tree fees and any encroachment permit aren't included.
  • School district rate not captured; shown at the statewide cap.
  • Local size, height and parking rules not captured yet; the state minimums apply.

News

Recent changes affecting Gilroy

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

State lawStatewide

SB 543 takes effect: no impact fees at 750 sq ft or less, now in Gov. Code 66311.5

SB 543 (Chapter 520, Statutes of 2025) took effect January 1, 2026. It restates the impact-fee rule in Gov. Code 66311.5: no impact fees on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less; above that, fees must be proportional to the primary home. It also caps JADUs at 500 sq ft of interior livable space. Many city documents still cite the older section numbers (65852.2 or 66324).

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Gilroy

How much are ADU fees in Gilroy?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Gilroy’s official fee schedules comes to $0–$4,135 at 750 sq ft and $9,959–$15,439 at 1,000 sq ft. These totals leave out valuation-based building fees. Ranges show fees that may or may not apply to your project.

Does Gilroy charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home. At 1,000 sq ft, the impact fees we model for Gilroy come to at most $9,959.

Do school fees apply to an ADU?

Only at 500 sq ft or more. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

Sources

Official sources

  1. City of Gilroy, Public Works DepartmentFees to Build, Public Works (effective July 1, 2026 to June 30, 2027) (opens in new tab)In effect: July 1, 2026 · Last checked Oct 18, 2026
    5 quoted lines
    • ADU - 750 sf or larger $ 9,749.07 x
    • ADU – 750 sf or larger $ 5,430.25 x
    • ADU – 750 sf or larger $ 3,676.38 x
    • ADU – 750 sf or larger $ 943.77 x
    • ADU – 750 sf or larger $ 118.82 x
  2. City of GilroyComprehensive User Fee Schedule (effective July 1, 2026) (opens in new tab)In effect: July 1, 2026 · Last checked Oct 18, 2026
    13 quoted lines
    • 2,001 25,000 325.38 337.75 17.31 17.97 1,000
    • 25,001 50,000 723.68 751.18 12.49 12.96 1,000
    • 50,001 100,000 1,036.02 1,075.39 8.66 8.99 1,000
    • 100,001 500,000 1,468.95 1,524.78 6.92 7.18 1,000
    • 500,001 1,000,000 4,236.86 4,397.86 5.87 6.09 1,000
    • 1,000,001 and up 7,171.72 7,444.24 3.89 4.04 1,000
    • Building valuation shall be based on the higher of 1) the applicant's estimated valuation, or 2) the
    • 7 Plan Check Review Minimum 1/2 hour division hourly rate 75% of building permit fee 75% of building permit fee
    • General Plan Update Fee / High Speed Rail Master Plan Fee to offset city’s
    • 22 13% 13%
    • 46 Building Technology Fee 5% % of permit fees 5%
    • 15 Category 1 - Residential, 1st to 3rd Story: Valuation x 0.00013= Fee
    • 25 Addressing Fee $ 97 each $ 100
  3. City of Gilroy (prepared by NBS)FY 2026 Annual and Five-Year Development Impact Fee Report (opens in new tab)In effect: July 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • Rate X [total ADU sf/total primary residence sf]
  4. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  5. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  6. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.