ADU FeeMap

Updated Oct 18, 2026

ADU fees in Monterey: $0–$9,098 in modeled fees for 1,000 sq ft, plus valuation-based permits

Monterey’s FY 2026/27 schedule lists no development impact fees, so an ADU’s City fees are mainly building plan check and permit, both from a valuation table, plus a 15% General Plan fee and a 10% fire review. The City doesn’t publish a valuation per sq ft, so enter your construction value to see those lines. A sewer connection fee of up to $3,718 may apply.

Totals leave out permit fees until you enter a construction valuation and valuation-based building fees and general plan fee, fire department review of building plans at some sizes. Enter a construction valuation in the calculator to include them.

Modeled fees by ADU size

Detached ADU, 2,000 sq ft main home (example assumption), law in force today. Bars: solid = fees that apply, hatched = fees that may apply.

  1. 499 sq ft

    $0–$3,718

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  2. 750 sq ft

    $0–$7,753

    Impact fees: $0 (750 sq ft or less)

    Itemize in calculator →
  3. 1,000 sq ft

    $0–$9,098

    Impact fees: $0 max

    Itemize in calculator →
  4. 1,200 sq ft

    $0–$10,174

    Impact fees: $0 max

    Itemize in calculator →

Line by line

Each fee with its official source (numbers link to the source list). Est. = computed by us from the official rate; May apply = high total only; Up to = statewide cap, district may charge less.

Fee499 sq ft750 sq ft1,000 sq ft1,200 sq ft
Planning & zoning
General Plan fee115% of the building permit fee.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Building permit & plan check
Building plan check (valuation table)1Base amount for the valuation range plus the increment per $1,000 above its low end. The City publishes no valuation per sq ft; enter your construction valuation.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Building permit (valuation table)1Base amount for the valuation range plus the increment per $1,000 above its low end.Needs valuationNeeds valuationNeeds valuationNeeds valuation
Fire Department review of building plans (residential)110% of the building plan check fee.Needs valuationNeeds valuationNeeds valuationNeeds valuation
School district fee
School fee (district; statewide cap shown)3ExemptUp to$4,035Up to$5,380Up to$6,456
Utility connections
Sewer connection fee1$3,718 per dwelling unit. For a new ADU, state law requires any connection fee to be proportionate to the ADU’s burden on the system, so the City may charge less; none for a conversion of existing space.May apply$3,718May apply$3,718May apply$3,718May apply$3,718
Modeled total$0–$3,718$0–$7,753$0–$9,098$0–$10,174

More

More on ADU fees in Monterey

Rules

What you can build in Monterey

Maximum size
State floor: cities must allow at least 850 sq ft (1,000 sq ft with 2+ bedrooms); detached ADUs can be capped at 1,200 sq ft. Local rule not captured yet. 4
Height
State floor: 16 ft detached (18 ft near transit or on a multifamily lot, +2 ft for roof pitch); 25 ft attached. Local rule not captured yet. 4
Setbacks
State limit: no more than 4 ft side and rear. Local rule not captured yet. 4
Parking
State limit: at most 1 space per ADU or bedroom, and none within ½ mile of transit and in other cases. Local rule not captured yet. 4
Owner occupancy
State law: cities can't require the owner to live on site for an ADU (JADUs: owner on site if sanitation is shared). Local rule not captured yet. 4
Pre-approved plans
State law: every city must run a program to pre-approve ADU plans (Gov. Code 65852.27). Local rule not captured yet. 4

State law

Why a 750 sq ft ADU pays no impact fees

California bars impact fees on ADUs of 750 sq ft or less of interior livable space. Above that, they must be proportional to the main home’s size; we assume 2,000 sq ft unless you enter yours. School fees apply only above 500 sq ft. From January 1, 2027, SB 1117 limits impact fees to the area over 750 sq ft. How the state rules work →

ADU permits issued

Monterey issued 144 ADU building permits in 2025

487 from 2018 to 2025, as the jurisdiction reported to the state in its Housing Element Annual Progress Reports (Table A2, ADU rows; may include JADUs). “–” means no ADU rows were reported that year.

  1. 42018
  2. 62019
  3. 312020
  4. 362021
  5. 632022
  6. 822023
  7. 1212024
  8. 1442025

Source: HCD via data.ca.gov, Housing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab), retrieved Oct 18, 2026.

Not modeled yet

What these totals leave out

  • Plan check and permit fees depend on project valuation, which the City doesn’t publish per sq ft; enter your own valuation in the calculator.
  • Monterey Peninsula Water Management District permits and fees, and any Monterey One Water charges, aren’t included.
  • Planning review, if your ADU needs one (for example in a historic or coastal area), isn’t included.

News

Recent changes affecting Monterey

State lawStatewide

SB 1117 signed: from 2027, ADU impact fees can only be charged on the area over 750 sq ft

The Governor approved SB 1117 (Chapter 809, Statutes of 2026) on September 29, 2026. It amends Gov. Code 66311.5: on lots with up to two ADUs, impact fees on an ADU over 750 sq ft must still be proportional to the primary home, and may only be charged on the area over 750 sq ft. Regular 2026 statutes take effect January 1, 2027. Until then, fees on a larger ADU are figured on its full size. Our calculator has a 2027 setting that shows the difference.

Source: California Legislative Information: SB 1117 (Chapter 809, Statutes of 2026), chaptered text (opens in new tab)

GuidanceStatewide

HCD publishes its updated ADU Handbook (March 2026)

The Department of Housing and Community Development updated its ADU Handbook to reflect the laws that took effect January 1, 2026. Its proportional-fee example: a 1,000 sq ft ADU next to a 2,000 sq ft home pays 50% of the fee a new home would pay. Our models use 2,000 sq ft as the example primary-home size unless you enter your own.

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

School feesStatewide

State Allocation Board raises the Level 1 school fee cap to $5.38 per sq ft

On January 28, 2026 the State Allocation Board raised the statewide maximum Level 1 developer fee for residential construction from $5.17 to $5.38 per sq ft (+4.06%). School districts collect it on ADUs of 500 sq ft or more, at their own adopted rate up to this cap (higher Level 2/3 fees need extra findings). Where we haven't confirmed a district's rate, we use $5.38 as the upper bound.

Source: California State Allocation Board (Department of General Services, OPSC): State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)

State lawStatewide

SB 543 takes effect: no impact fees at 750 sq ft or less, now in Gov. Code 66311.5

SB 543 (Chapter 520, Statutes of 2025) took effect January 1, 2026. It restates the impact-fee rule in Gov. Code 66311.5: no impact fees on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less; above that, fees must be proportional to the primary home. It also caps JADUs at 500 sq ft of interior livable space. Many city documents still cite the older section numbers (65852.2 or 66324).

Source: California Department of Housing and Community Development (HCD): Accessory Dwelling Unit Handbook (March 2026) (opens in new tab)

All ADU fee news →

FAQ

Questions about ADU fees in Monterey

How much are ADU fees in Monterey?

For a detached ADU with a 2,000 sq ft main home (an example assumption), our model of Monterey’s official fee schedules comes to $0–$7,753 at 750 sq ft and $0–$9,098 at 1,000 sq ft. These totals leave out permit fees until you enter a construction valuation and valuation-based building fees and general plan fee, fire department review of building plans at some sizes. Ranges show fees that may or may not apply to your project.

Does Monterey charge impact fees on a 750 sq ft ADU?

No. California Government Code section 66311.5 bars impact fees on an ADU of 750 sq ft of interior livable space or less (500 sq ft or less for a JADU). Above 750 sq ft, impact fees must be proportional to the size of the main home.

Do school fees apply to an ADU?

Only above 500 sq ft. School districts charge their adopted developer fee per sq ft, capped at the State Allocation Board’s Level 1 maximum ($5.38 per sq ft since January 28, 2026) unless they qualify for higher levels.

Sources

Official sources

  1. City of MontereyMaster Fee Schedule, Fiscal Year 2026/2027 (opens in new tab)In effect: July 1, 2026 · Last checked Oct 18, 2026
    13 quoted lines
    • Plan Check - Project Valuation2
    • $50,000.01 $100,000 1000 $1,566.00 $18.50
    • $100,000.01 $500,000 1000 $2,464.00 $14.50
    • $500,000.01 $1,000,000 1000 $8,215.50 $12.50
    • $25,000.01 $50,000 1000 $917.50 $26.50
    • Building Permit Fees - Project Valuation2
    • $25,000.01 $50,000.00 1000 $1,434.50 $41.00
    • $50,000.01 $100,000.00 1000 $2,430.50 $28.50
    • $100,000.01 $500,000.00 1000 $3,813.00 $20.50
    • $500,000.01 $1,000,000.00 1000 $12,658.50 $19.00
    • General Plan Fee 15% of building permit fee
    • 10% of Building Plan Fire Department Review of Building Plans, Residential Check Fee
    • Sewer Connection Fee2 Dwelling Unit $3,718.00
  2. City of Monterey Building & SafetyADUs and JADUs (opens in new tab)In effect: Current page · Last checked Oct 18, 2026
    1 quoted line
    • Will impact fees apply? Fees are assessed in accordance with state law and the City’s adopted fee schedule.
  3. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
    2 quoted lines
    • Residential $4.79 $5.17 $5.38
    • Increase the 2026 maximum Level I assessment for development in the amount of 4.06 percent
  4. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
    1 quoted line
    • A local agency, special district, or water corporation shall not impose any impact fee upon the development of an accessory dwelling unit that has 750 square feet of interior livable space or less
  5. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026

We save a copy of every source and check that each quoted line still appears in it. How we check.