800 sq ft ADU fees in San José: $12,647–$26,728, $11,331 more than at 750 sq ft

At 800 sq ft an ADU crosses the 750 sq ft line, so San José’s impact fees apply in proportion to the main home: $8,900 with a 2,000 sq ft house, against $0 at 750 sq ft. From January 1, 2027, SB 1117 limits them to the 50 sq ft over 750, which our model puts at $556.

750 vs 800

What the extra 50 sq ft changes in San José

  • ADU permit issuance (incl. address): $422 at 750 sq ft → $633 at 800 sq ft
  • ADU plan review: $1,137 at 750 sq ft → $1,950 at 800 sq ft
  • ADU inspection (incl. meter release): $1,732 at 750 sq ft → $2,520 at 800 sq ft
  • Building & Structure Construction Tax (1.54% of valuation): $2,032 at 750 sq ft → $2,167 at 800 sq ft
  • Commercial-Residential-Mobilehome Park Construction Tax (2.42%): $3,193 at 750 sq ft → $3,406 at 800 sq ft
  • State SMIP + building standards fees: $18 at 750 sq ft → $20 at 800 sq ft
  • Parkland impact fee (ADUs over 750 sq ft): $0 at 750 sq ft → $1,700–$8,900 at 800 sq ft (exempt at 750)
  • School impact fee (your district): $0–$4,035 at 750 sq ft → $0–$4,304 at 800 sq ft

Staying at 750 sq ft would save about $11,331 in fees under today’s law.

Itemize with your house size See rent and payback

Line by line: 750 sq ft vs 800 sq ft, now and under SB 1117

Detached ADU, 2,000 sq ft main home (example assumption). The 2027 column applies SB 1117, which limits impact fees to the area over 750 sq ft.

Fee750 sq ft (2026)800 sq ft (2026)800 sq ft (from 2027)
Planning & zoning
Planning review of the building permitMay apply$449May apply$449May apply$449
Building permit & plan check
ADU permit issuance (incl. address)$422$633$633
ADU plan review$1,137$1,950$1,950
ADU inspection (incl. meter release)$1,732$2,520$2,520
Fire plan check + inspectionMay apply$1,269May apply$1,269May apply$1,269
Construction taxes
Building & Structure Construction Tax (1.54% of valuation)Est.$2,032Est.$2,167Est.$2,167
Commercial-Residential-Mobilehome Park Construction Tax (2.42%)Est.$3,193Est.$3,406Est.$3,406
Construction Tax + Residential Construction Tax (per unit)$251–$330$251–$330$251–$330
State SMIP + building standards feesEst.$18Est.$20Est.$20
Impact fees
Parkland impact fee (ADUs over 750 sq ft)Exempt$1,700–$8,900Est.$106–$556
School district fee
School impact fee (your district)Up to$4,035Up to$4,304Up to$4,304
Utility connections
Sewage treatment plant connectionMay apply$780May apply$780May apply$780
Modeled total$8,785–$15,397$12,647–$26,728$11,053–$18,384

State law

Why 800 sq ft is the size every city must allow

Local limits on lot coverage, floor area ratio, open space and minimum lot size can’t stop an 800 sq ft ADU with 4 ft side and rear setbacks, and a detached unit of up to 800 sq ft must be approved ministerially alongside a junior ADU.

San José: Detached ADU: 1,000 sq ft on lots under 9,000 sq ft; 1,200 sq ft on lots over 9,000 sq ft. JADU: 500 sq ft.

  • Gov. Code §66321(b)(3)

    size based upon a percentage of the proposed or existing primary dwelling, or limits on lot coverage, floor area ratio, open space, front setbacks, and minimum lot size, for either attached or detached dwellings that does not permit an accessory dwelling unit with at least 800 square feet of interior livable space and with four-foot side and rear yard setbacks to be constructed in compliance with all other local development standards.
  • Gov. Code §66323(a)(2)

    One detached, new construction, accessory dwelling unit that does not exceed four-foot side and rear yard setbacks for a lot with a proposed or existing single-family dwelling.
  • Gov. Code §66323(a)(2)(A)

    A total floor area limitation of not more than 800 square feet of livable space.

Quoted from Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab), checked Oct 18, 2026.

FAQ

Questions about 800 sq ft adu in San José

How much are the fees for an 800 sq ft ADU in San José?

Our model of San José’s official schedules comes to $12,647–$26,728 for a detached 800 sq ft ADU with a 2,000 sq ft main home, compared with $8,785–$15,397 at 750 sq ft.

Does an 800 sq ft ADU pay impact fees in San José?

Yes: $8,900 in our model, because 800 sq ft is over the 750 sq ft exemption. Fees must be proportional to the main home; a larger house means a smaller share. From 2027, SB 1117 limits them to the 50 sq ft over 750 ($556 in our model).

Can San José stop me from building an 800 sq ft ADU?

Not with lot coverage, floor area ratio, open space or minimum lot size limits. State law requires cities to allow at least an 800 sq ft ADU with 4 ft side and rear setbacks (Gov. Code §66321(b)(3)), provided it meets other objective standards such as height.

Do school fees apply at 800 sq ft?

Yes. School fees apply above 500 sq ft; at 800 sq ft the statewide Level 1 cap is $4,304, and many districts charge less.

Not modeled yet

What these totals leave out

  • Which planning and fire review an ADU gets (counted in the high total only).
  • Your parcel's parkland fee zone ($1,700–$8,900 range shown).
  • School district rates (statewide Level 1 maximum shown instead).
  • Water meter and connection charges from your water company.
  • Public Works storm and sanitary sewer fees, which the schedule lists per lot and doesn't address for ADUs.

More

Keep going

Sources

Official sources

Every figure comes from these documents; each line’s quoted text is on the San José page.

  1. City of San José, Planning, Building & Code EnforcementFY 2026-27 Building and Structure Permits Fee Schedule (effective August 10, 2026) (opens in new tab)In effect: August 10, 2026 · Last checked Oct 18, 2026
  2. City of San José, Parks, Recreation & Neighborhood ServicesParkland Impact Fees for ADUs (map) (opens in new tab)In effect: 2020 map; still linked from the City fee page · Last checked Oct 18, 2026
  3. City of San JoséADU Universal Checklist (opens in new tab)Last checked Oct 18, 2026
  4. City of San JoséADU FAQs (opens in new tab)Last checked Oct 18, 2026
  5. City of San JoséDevelopment Construction Taxes (opens in new tab)Last checked Oct 18, 2026
  6. California State Allocation Board (Department of General Services, OPSC)State Allocation Board item: 2026 adjustment to the Level I developer fee (meeting of January 28, 2026) (opens in new tab)In effect: January 28, 2026 · Last checked Oct 18, 2026
  7. California Legislative Information (leginfo.legislature.ca.gov)Government Code, Title 7, Division 1, Chapter 13 (Accessory Dwelling Units), incl. §66311.5 (opens in new tab)In effect: In force since January 1, 2026 · Last checked Oct 18, 2026
  8. HCD via data.ca.govHousing Element Annual Progress Report (APR) data, Table A2: ADU building permits by year (opens in new tab)Last checked Oct 18, 2026